


This is a hybrid solar system implemented at Mara Elatia camp, Narok county, to provide a reliable and stable source of power for the camp. Designed to operate independently of the national power grid, this system ensures uninterrupted power supply while promoting clean energy adoption.
Project: Mara Elatia Camp
Capacity: 195Kwp
Type: Ground Mount
Location: Maasai Mara
Solar Module: Longi Himo-x10 625w
Inverters: 150(3 × 50kw) Deye Hybrid
Bess: 591kwh(3× 197kwh) Vestwood Lithium ion Batteries
Work Performed: Design, Supply of Equipment and Materials, Installation and Commissioning